PRESS
After 10 years since the proceedings of the Structure Plan, the municipal administration has adopted a Regulation Urban which is inconsistent and wrong in form and substance of which safely and cost have on the whole, over the 6 zeros.
The Syndicate Inarsind Architects Engineers has promoted, in July, a public meeting on the subject, calling on the City's planning department and other community leaders.
On that occasion, the Mayor has taken upon itself the responsibility of the UK states that, by the difficulties inherited from the previous Administration , much better could not be done. The commissioner announced the intention to rapid approval of the RU within the year. Was given in addition to the mandate same designer of the UK, for the current phase of rebuttal.
professionals Arezzo, in taking note of what was said by the Mayor, consider that in such circumstances, the lesser evil consists of a quick approval before the next elections in the spring, leaving at least from the paralyzing "maintenance regime", or by double-checking the zoning .
have all been re-proposed a series of questions;
By what criteria will be treated more than 2000 observations in order to bring to use the RU?
What resources were put in place to achieve the goal of a speedy approval?
In that way, citizens can make their voices heard during the analysis of observations?
remains, however, explained the confusion by many, of how it was possible for an instrument so wrong. The Council Committee that prior to City Council ruled on the UK, was given adequate information?
The approximately 80 documents of Professional products in the study phase of the UK had been read?
The many contributions of the various professionals during the public meetings were regularly highlighted the problems had been analyzed?
all the criticism, reported verbally, painstakingly transcribed the website of the City (still detectable) could not be substantiated.
Now, after the adoption, he began to think that the approximately 60 submissions professional bodies, for about 100 items of technical standards, are a serious matter that should be rewritten as technical standards, which must review all new areas of expansion (ATS), simplify agricultural areas, recover ' use of zones B, erase the erroneous notion of Equalization and hexoses used to drastically reduce the number of complex plans of action in the UK this will become
need to lay hands too large error of the territory for which copses are as terraced olive groves, many buildings have been read and thus laid the wrong way, some stretches of river are displaced with respect to reality and the consequent "Risk plumber" is calculated on a torrent ghost, and so on.
We hope that everything goes well but it is certain that, even if all the comments for improvement were accepted, the UK will still be woefully inadequate to the expectations and needs of the city, and that past elections, it will then start again, giving Arezzo a planning instrument that people finally have an idea for his future.
The President of Arezzo INARSIND
Alessandro Cinelli Architect